Active Site Operations

Live Turnkey Infrastructure & Civil Engineering Sites

Calvin Construction Group is currently managing over 890+ active project sites with digital BIM 3D progress tracking, heavy plant mobilization, and 24/7 on-site quality assurance.

Active Construction (78% Complete)

Midrand Commercial Freight Mega-Hub

Midrand Industrial Corridor | Target Handover: Q4 2026

Phase 3 construction of a 25,000 m² automated logistics hub, high-load concrete docking bays, structural steel framing, and access highway link roads.

Progress Milestone: 78% Superstructure & Roofing Phase
14 Heavy Units Deployed Site Details
Active Highway Paving (62% Complete)

Western Bypass Dual-Carriageway Paving

Regional Highway Sector 4 | Target Handover: Q1 2027

High-volume bituminous asphalt paving, soil stabilization, culvert bridge reconstruction, and safety barrier installation over a 32km corridor.

Progress Milestone: 62% Asphalt Binder Course Layer
22 Pavers & Rollers Active Site Details
Framing & Superstructure (45% Complete)

Centurion Heights Residential Towers

Urban Centre | Target Handover: Q2 2027

Construction of dual 14-story residential towers with reinforced concrete core, post-tensioned floor slabs, and integrated energy-saving MEP services.

Progress Milestone: 45% Level 8 Concrete Pour
2 Tower Cranes Operational Site Details
Final MEP & Fitout (88% Complete)

Metro Rail Transit Passenger Terminal

Central Transport Interchange | Target Handover: Q3 2026

Turnkey civil transit facility, passenger concourses, structural space frame roofing, heavy-duty escalator pits, and pedestrian overpasses.

Progress Milestone: 88% Finishing & Testing Phase
0 Lost-Time Incidents Site Details