Active Site Operations
Calvin Construction Group is currently managing over 890+ active project sites with digital BIM 3D progress tracking, heavy plant mobilization, and 24/7 on-site quality assurance.
Phase 3 construction of a 25,000 m² automated logistics hub, high-load concrete docking bays, structural steel framing, and access highway link roads.
High-volume bituminous asphalt paving, soil stabilization, culvert bridge reconstruction, and safety barrier installation over a 32km corridor.
Construction of dual 14-story residential towers with reinforced concrete core, post-tensioned floor slabs, and integrated energy-saving MEP services.
Turnkey civil transit facility, passenger concourses, structural space frame roofing, heavy-duty escalator pits, and pedestrian overpasses.